Search This Blog

Contact the Blog

Contact the Crewenews by using our form click here

Join me on the forum below as I am on the staff as Samuria 24/7/365 worldwide support all FREE

 PC Help Forum

'

Friday 26 August 2011

BY PASS ROAD RESURFACING WORK WELCOMED

 

Cheshire East Councillor Brian Silvester has welcomed the resurfacing of the west bound lane of the A500 Shavington By Pass that runs through his Willaston and Rope Ward. ( See below) It is anticipated that the works will be carried out on:Thursday 8th Friday 9th September 2011 between 19.00 – 0.500 hours and Saturday 10th September 2011 between 06.00 – 20.00 hours.

He said, " I am very pleased that the Cheshire East Council is to resurface part of the A500. This is a very heavily used dual carriageway that leads to and from the motorway and some drive far too fast along it. Llke other roads in the area the by pass has suffered badly from some very severe weather in recent times. We have had two very cold winters and they have taken their toll on our local roads. The work will certainly make the road safer to use and the journey will be smoother."


Cllr. Brian Silvester
Willaston and Rope Ward Councillor

Tel/fax 01270 567757

CHESHIRE EAST BOROUGH COUNCIL

NOTICE OF TEMPORARY ROAD CLOSURE

ROAD TRAFFIC REGULATION ACT 1984

A500 SHAVINGTON BYPASS

WEST BOUND LANE CLOSURE

NOTICE IS HEREBY GIVEN that the Cheshire East Borough Council, in exercise of its powers under Section 14(2) of the Road Traffic Regulation Act 1984 and of all other enabling powers, issues this notice temporarily to prohibit traffic in the following length of road:- 

A500 SHAVINGTON BYPASS, (WEST BOUND LANE ONLY)

Between Meremore Roundabout and Cheerbrook Roundabout

The alternative route during the closure will be via; A531 Newcastle Road and C481 Newcastle Road and vice versa

Pedestrian access will be maintained at all times.

Vehicular access will be maintained for emergency vehicles and residents.

The closure is necessary to enable Cheshire East Highways to carry out carriageway resurfacing works

It is anticipated that the works will be carried out on:

Thursday 8th Friday 9th September 2011 between 19.00 – 0.500 hours

Saturday 10th September 2011 between 06.00 – 20.00 hours

This notice will become operative on Thursday 8th September 2011 for a period of 5 days or for such less time as is necessary to enable the works to be completed.

If you have any enquiries relating to the works please contact Mark Swindells at Cheshire East Highways on telephone number 0300 123 5020

No comments: